DEWA Net Metering & Shams Dubai — Complete 2025 Guide

Complete guide to DEWA net metering and Shams Dubai 2025. Step-by-step application, eligibility, benefits & how to export solar power back to DEWA grid.

#DEWA solar#Shams Dubai#net metering UAE#solar grid Dubai

What is Shams Dubai? DEWA's Solar Net Metering Programme

Launched by DEWA (Dubai Electricity and Water Authority), Shams Dubai is a solar net metering programme that allows property owners in Dubai to install rooftop solar panels, consume the generated solar electricity on site, and export surplus power back to DEWA's grid — receiving bill credits for every unit exported. Future Heights Technical Services is a DEWA-approved solar EPC contractor registered under Shams Dubai.

Who is Eligible for DEWA Net Metering?

  • Residential villa and apartment owners in Dubai
  • Commercial and industrial property owners in Dubai emirate
  • Must have an active DEWA connection and account

Step-by-Step DEWA Solar Application Process

  • Step 1 — Choose a DEWA-approved solar contractor in Dubai (Future Heights is registered).
  • Step 2 — Contractor submits solar system design to DEWA for approval (5–10 working days).
  • Step 3 — Solar system is installed on your property by the EPC contractor.
  • Step 4 — DEWA engineers inspect the solar installation for compliance.
  • Step 5 — DEWA installs a bidirectional smart meter for net metering.
  • Step 6 — Grid connection goes live. You start generating, consuming & exporting solar energy.

How DEWA Net Metering Credits Work

Solar units you consume directly from your system cost nothing on your DEWA bill. Units exported to the DEWA grid are credited at DEWA's applicable rate and roll over monthly. A 100 kW commercial solar system in Dubai typically reduces DEWA electricity bills by 60–80% annually.

Timeline for DEWA Solar Connection in Dubai

From solar installation application to live DEWA grid connection: typically 4–8 weeks depending on system size. Future Heights Technical Services manages the complete DEWA application process, ensuring the fastest possible solar grid connection in Dubai.

☀️