← Back to Blog
CommercialApril 20, 2025· 7 min read
📊

Commercial Solar Dubai — ROI & Payback Period Guide

Calculate the exact ROI and payback period for commercial solar in Dubai. Real numbers for warehouses, offices & factories with UAE electricity rates included.

#commercial solar Dubai#solar ROI UAE#solar payback period Dubai

UAE Commercial Electricity Tariff Rates 2025 (DEWA)

  • 0–10,000 kWh/month: AED 0.23/kWh
  • 10,001–30,000 kWh: AED 0.28/kWh
  • 30,001–100,000 kWh: AED 0.32/kWh
  • 100,000+ kWh: AED 0.38/kWh

Commercial Solar ROI Example — 100 kW Warehouse in Dubai

  • Solar system cost: AED 420,000 installed
  • Annual solar generation: ~160,000 kWh (Dubai avg: 1,600 kWh/kWp/year)
  • Annual DEWA bill savings: AED 48,000 – AED 56,000
  • Solar payback period: 7.5 years
  • 25-year net solar return: AED 980,000+ profit

Industrial Solar ROI Example — 500 kW Facility in UAE

  • Solar system cost: ~AED 1,800,000
  • Annual DEWA savings: AED 250,000 – AED 320,000
  • Solar payback period: 5.5 – 7 years
  • 25-year net solar return: AED 4.5M – AED 6M

Get Your Free Commercial Solar ROI Calculation in Dubai

Future Heights Technical Services provides a free, detailed solar feasibility study for commercial and industrial properties across Dubai and UAE — including exact solar ROI, payback period, and DEWA savings projections.

☀️

Ready to Get Started?

Talk to our solar experts for a free consultation & custom quote — no obligation.

Related Articles